2023 1019 140104
When the Pipestem Dam was opened in 1973, it was one of the first things I ever photographed.
Pipestem Dam was constructed for flood damage reduction, fish and wildlife enhancement, and recreation. Construction of the dam began in June 1971, and was completed in 1973. The dam measures approximately 4,000 feet in length, with a maximum height of 107.5 feet from the stream bed to the top of the dam. Also nearby is the Jamestown Dam and Reservoir, which is operated by the U.S. Bureau of Reclamation.