Thank you for your patience while we retrieve your images.
Uploaded 11-Jan-26
Taken 19-Dec-25
Visitors 2


124 of 181 photos
Thumbnails
Info
Photo Info

Dimensions4128 x 2322
Original file size2.47 MB
Image typeJPEG
Color spacesRGB
Date taken19-Dec-25 11:17
Date modified19-Dec-25 11:17
Shooting Conditions

Camera makesamsung
Camera modelSM-S767VL
FlashNot fired
Exposure modeAuto
Exposure prog.Normal
ISO speedISO 160
Metering modeCenter-weighted average
2025 1219 1116 43

2025 1219 1116 43

Marlowe Kulish Project: His shop is in northwest West Fargo.
I was David Monson's assistant. One side was done. The other side was half done. Marlowe was cutting the final lengths and handing them to me. I would hold them in place and David used the stapler (air compressor) to nail them. Occasionally I would use a small level to make sure the boards were level. This is suppose to look like a first century stable - it's not suppose to look good.
We assemble the roof, move it around, and then Marlowe and David staple the cedar shingles to the roof line. (It's only a foot deep.)